MILL CANAL STABILISATION
Repairing a historic underground watercourse
The emergency programme proposed restoration of the Mill Canal's water intake and load-bearing structures.
Collapsed sections of brick and boulder vaulting were to be reconstructed, while areas carrying vehicle loads were to receive concealed reinforced concrete unloading slabs.
Voids in the surrounding soil, created by leakage through joints in the historic canal lining, were to be consolidated by injection to reduce further water loss and ground erosion.