The Solovetsky Monastery is closely connected with an extensive historic hydraulic system of lakes, canals, dams and water-control structures developed over several centuries.

Ivan Strelbitskii assessed the deteriorating condition of the hydraulic infrastructure associated with the monastery and developed a programme of priority emergency measures aimed at restoring water regulation, reducing filtration through the monastery embankment and protecting historic structures from continuing deformation.
A HISTORIC WATER-MANAGEMENT LANDSCAPE
More than five centuries of hydraulic engineering
Water management on Bolshoi Solovetsky Island developed alongside the monastery from the 15th century onwards.

The island contains more than 500 lakes, while the historic water-management network includes around 20 local lake-canal systems and more than 200 man-made canals. Canal construction began around the turn of the 15th and 16th centuries and expanded significantly under Abbot Philip in the mid-16th century.

By the 19th and 20th centuries, the Holy Lake system had developed into a highly sophisticated network of 65 lakes connected by 69 canals, together with locks, dams and water-control structures serving transport, drainage, mills and later hydroelectric generation.
Historic construction of a canal feeding the Holy Lake system
Historic dam within the Solovetsky hydraulic network
IVAN'S ROLE

Conservation Engineer
You can't connect the dots looking forward, you can only connect them looking backwards.
Hydraulic System Assessment
Evaluation of the condition and functioning of historic canals, spillways, embankments and associated water-control structures.

Structural Diagnosis
Assessment of deterioration affecting masonry channels, embankments, foundations and adjacent historic buildings.

Risk Analysis
Identification of critical hydraulic failures and their potential consequences for the monastery complex.

Emergency Conservation Strategy
Development of a staged programme for restoring water discharge, stabilising structures and reducing damaging filtration through foundation soils.

The document identifies Ivan as a Restoration Engineer of Top Category.
WHY THE HYDRAULIC SYSTEM MATTERS
Water management as part of the monastery’s structural stability
The Solovetsky Monastery stands on an isthmus between the Holy Lake and Blagopoluchiya Bay, with an elevation difference of approximately 8–9 metres between the two bodies of water.

The massive stone monastery complex was constructed on artificial fill, making controlled drainage and water discharge particularly important for the stability of its foundations. Historically, several channels carried water from the Holy Lake towards the sea.

By the time of Ivan's assessment, however, most of these routes were no longer functioning.
CONDITION OF THE SYSTEM
Loss of maintenance and progressive hydraulic failure
The historic lake-canal system had entered a critical state following decades of insufficient maintenance.

Canals had become overgrown and silted, water-control structures had deteriorated, and the ability to regulate water levels across the system had largely been lost.

These failures were changing the hydrogeological regime of the island, contributing to renewed waterlogging of previously drained areas and affecting roads, channels and other infrastructure.
KEY CONSERVATION CHALLENGES

Failing Watercourses

Most historic discharge channels were no longer functioning reliably.
Foundation Suffusion
Uncontrolled water filtration was washing fine particles from foundation soils and reducing their bearing capacity.
Structural Deformation
Settlement and movement were affecting embankments and historic structures within the monastery complex.
Loss of Water Regulation
The system had largely lost its ability to control lake levels and safely discharge water towards the sea.
THE VESHNYAK CANAL
The last functioning spillway in emergency condition
Of the historic channels draining the Holy Lake towards the sea, the Veshnyak Canal remained the only functioning spillway.

Its condition was already described as an acute emergency. Failure of this final working watercourse, without an alternative drainage route, presented a serious risk to the southern part of the monastery.
Emergency condition of the Veshnyak Canal arch
FOUNDATION SUFFUSION
Water filtration beneath the monastery
A major concern was filtration through the earth embankment on which part of the monastery stands.

A historic clay barrier had originally been introduced to reduce water loss and protect the foundations. Over time, however, its waterproofing performance appears to have deteriorated.

Increased filtration allowed fine soil particles to be washed out, weakening foundation soils and contributing to deformation of building foundations and walls.
Subsidence of the Holy Lake embankment in an area affected by foundation-soil suffusion
STRUCTURAL IMPACT ON THE MONASTERY
Hydraulic failure extending beyond the canals themselves
The consequences of the deteriorating water-management system were visible in several parts of the monastery.

Deformation was recorded along the alignment between the Holy Lake embankment and the sea, including structures such as the Kvasovarnaya Tower and Treasury Building.

The assessment linked these problems to uncontrolled water filtration and the resulting weakening of foundation soils rather than treating each building deformation as an isolated defect.

This is an important section because it shows Ivan's systems-level engineering diagnosis.
THE HYDRAULIC COMPLEX
Multiple interdependent structures in critical condition
The assessment considered the hydraulic system as a network rather than a collection of isolated monuments.

Critical or non-operational elements included:

Veshnyak Canal
The only functioning Holy Lake spillway — acute emergency condition.

Mill Canal
Inoperative and structurally deteriorated.

Hydroelectric Power Station Channel
No longer functioning.

Holy Lake Embankment
Deformed and affected by filtration.

Dry Dock
Inoperative.

Hydroelectric Power Station
Unable to function because of reduced water flow, failed pipelines and structural deterioration.
Emergency facilities within the Solovetsky hydraulic complex
EMERGENCY CONSERVATION STRATEGY
Restoring hydraulic control before wider restoration
Ivan's assessment concluded that isolated repairs would not resolve the underlying problem.

A comprehensive programme was required, beginning with the emergency discharge structures around the monastery and only later extending to the wider island canal network.

The first priority was to restore safe control of water levels and re-establish reliable routes for discharge from the Holy Lake.
MILL CANAL STABILISATION
Repairing a historic underground watercourse

The emergency programme proposed restoration of the Mill Canal's water intake and load-bearing structures.

Collapsed sections of brick and boulder vaulting were to be reconstructed, while areas carrying vehicle loads were to receive concealed reinforced concrete unloading slabs.

Voids in the surrounding soil, created by leakage through joints in the historic canal lining, were to be consolidated by injection to reduce further water loss and ground erosion.
EMBANKMENT STABILISATION
Reducing filtration through the monastery foundation
The Holy Lake embankment required a combination of dismantling, waterproofing and structural strengthening.

The proposed works included carefully removing and recording existing granite elements, reinstating a clay anti-filtration barrier, constructing a pile-supported grillage beneath the embankment structures and then replacing the historic stonework.

The objective was not simply to repair the visible embankment but to reduce the filtration that was weakening the underlying ground.
RESTORING THE VESHNYAK CANAL
Securing the primary emergency spillway
The programme called for restoration of the Veshnyak Canal's water-control structures and repair of destroyed sections of its vault and walls.

Cracks in the canal bed, masonry walls and roof were to be injected to restore continuity and reduce leakage.

Because the Veshnyak remained the principal functioning discharge route, these works formed a critical part of the first-stage emergency programme.
WIDER STRUCTURAL INTERVENTIONS
Protecting buildings affected by water-related ground movement
The emergency programme extended beyond the canals themselves.

Ivan recommended strengthening foundations and masonry where deformation was linked to hydraulic failure, including the White Tower, Laundry, Mill Building and Treasury Building.

The proposed approach included injection of voids within masonry and foundations where water-related loss of support had developed.
SEQUENCING THE WORKS
Emergency stabilisation before restoring the wider network

A crucial part of the strategy was the order in which the works should proceed.

Ivan warned that restoring the wider island canal network too early could increase the volume of water entering the Holy Lake and make the already critical situation around the monastery more difficult to control.

Emergency works to the monastery spillways and nearby foundations therefore had to precede restoration of the wider hydraulic system.
CONSERVATION PRINCIPLE
Treating the hydraulic landscape as one interconnected system
The central principle of the assessment was that the historic canals, embankments, foundations and monastery buildings could not be conserved independently of one another.

Restoring structural stability required restoring controlled water movement through the historic hydraulic system.
PROJECT SUMMARY
  • 15th–16th century
    Origins of the canal system
  • 65 lakes
    Connected within the historic Holy Lake system
  • 69 canals
    Within the developed central network
  • 8–9 m

    Level difference between Holy Lake and Blagopoluchiya Bay
  • Ivan's role
    Restoration Engineer / Conservation Engineer
  • Project scope
    Hydraulic Assessment · Structural Diagnosis · Emergency Strategy · Foundation Stabilisation
CONSERVATION OUTCOME
The assessment established a coordinated emergency strategy for one of the most technically complex parts of the Solovetsky Monastery landscape.

Rather than treating damaged canals, embankments and building foundations as separate problems, the proposed programme addressed their common cause: the progressive failure of the historic water-management system and the resulting uncontrolled movement of water through the site.

The strategy prioritised restoration of safe water discharge, reduction of damaging filtration and stabilisation of structures at immediate risk before wider rehabilitation of the historic canal network.